Stories

Every hospital has a version of these.

Short, real accounts from facility teams: what happened, how EMMA helped, and what changed.

Flooding

The wrong valve

A sprinkler head is pulled, the wrong fire riser valve is closed, and water reaches the main floor and the maintenance shop. Staff find the correct valve in EMMA and stop the damage.

Electrical shutdown

One transformer, one minute

Testing a suspect underground cable meant moving the whole building onto one transformer. EMMA's isolation report sorted every load, and the switchover took about a minute.

Planning

Five floors in an hour

Routing a dryer exhaust through five levels used to take days with paper plans and transparencies. With EMMA's stacked reference points, it took about an hour.

Contractor access

Contractors who stop calling

An electrical contractor got read-only access to the electrical plans and stopped needing to ask where the power was.

Adoption

A new director's first look

A new director arrived skeptical about paying for EMMA. After logging in for the first time during a live demo, he asked for every system to be added.

Watch

Emergency flooding

Identifying spare capacity

Electrical shutdown