New construction & P3

Hand over a building your team can actually run.

Most new hospitals are handed over with binders, PDFs and as-builts that arrive months later. EMMA can be loaded from the issued-for-construction (IFC) drawings once they are 80–95% complete, and updated as revisions are issued, so facility staff inherit a live map of every system on day one instead of a pile of documents.

For owners

Write EMMA-ready requirements into the tender, covering drawing format, layer naming, room numbering and submissions, so contractors deliver data you can use.

For contractors and P3 partners

Fewer surprises at commissioning and through the maintenance term. Less exposure to floods, unplanned shutdowns and rooms out of service, and a stronger handover.

Funding

EMMA can be carried as a line item in the project budget, a small share of total project cost, rather than coming out of a fixed facilities budget.

How it fits the project

Design

Agree drawing, layer and room-numbering standards before the tender goes out.

Construction

Load EMMA from IFCs and keep it current as revisions are issued.

Handover

Final as-builts slot in with minimal rework, and staff are trained before opening day.

Planning a build or a major renovation?

Talk to us before the functional specs are final. That is when getting EMMA into the project is easiest.