See every consequence before you flip the breaker.
Select a switchboard, panel or valve. EMMA lists everything downstream, floor by floor: equipment, panels, circuits and rooms. Use the same tool for a planned maintenance shutdown or a 2 a.m. emergency.
Select
Pick the equipment you need to shut down, on the plan, the riser or the list.
See the impact
Every downstream panel, piece of equipment and room, shown floor by floor.
Notify
Export the isolation report to Excel and send it to the departments affected. Track the request through to completion.
One transformer, one minute
Testing a suspect underground cable meant moving the whole building's load onto a single transformer. The isolation report sorted every load into automatic transfer, manual transfer, or needing sign-off from the departments affected. The switchover itself took about a minute.
More storiesIn an emergency
When a pipe lets go, EMMA shows the nearest isolation valve on a phone, including sprinkler zone shut-offs, so the damage stops sooner.